Department of the Army DA PAM 700-28 — DA PAM 700-28 Integrated Logistic Support Program Assessment Issues and Criteria Manual PDF

Downloaded from https://www.everyspec.com Contents—Continued Hazardous Materials • 7–66, page 125 Environmental documentation • 7–67, page 125 Packaging • 7–68, page 125 Materiel fielding • 7–69, page 125 Other • 7–70, page 125 Appendix A. References, page 126 Table List Table 1–1: Paragraph Number Cross Reference Areas For ILS Assessment Considerations vs Milestone Type, page 2 Figure List Figure 1–1: Simplified life cycle system management model, page 3 Figure 1–2: Design influence assessment structure, page 4 Figure 1–3: Maintenance planning assessment structure, page 4 Figure 1–4: Manpower and personnel assessment structure, page 5 Figure 1–5:

Supply support assessment structure, page 5 Figure 1–6: Packaging, handling, and storage assessment structure, page 6 Figure 1–7: Support equipment and TMDE assessment structure, page 7 Figure 1–8: Training and training devices assessment structure, page 8 Figure 1–9: Technical data assessment structure, page 8 Figure 1–10: Computer resources support assessment structure, page 9 Figure 1–11: Transportation and transportability assessment structure, page 9 Figure 1–12: Facilities assessment structure, page 10 Figure 1–13: Standardization and interoperability assessment structure, page 10 Figure 1–14: Realiability, availability and maintainability assessment structure, page 11 Figure 1–15:

Support management and analysis assessment structure, page 11 Figure 1–16: Cost analysis and funding assessment structure, page 12 Figure 1–17: Materiel fielding planning assessment structure, page 12 Figure 1–18: Environmental planning, page 13 Figure 1–19: Tailored program examples, page 14 Glossary Index vii DA PAM 700–28 • 15 April 1994