Chapter 20 Network Configuration and Data Exchange 20.4.10 Online Start/Stop Ether Link (SM Flag) When the start mode of a node is in SM Flag , users can directly operate the flags under online monitoring state and start or stop a node under Ether Link operation; however, it is limited to nodes in monitoring. 20.4.10.1 Starting the Execution of an Ether Link Making a single node start the execution of an Ether Link Method 1 If users want to make a node start the execution of the Ether Link constructed, they have to select the node, and click on the toolbar.
They can also make the node start the execution of the Ether Link constructed by selecting the node, clicking the PLC menu, pointing to Flag Control , and clicking Start Ether Link (Single PLC) . Method 2 Select a node, right-click the node, and click Start Ether Link (Single PLC) on the context menu. 20-79