Chapter 5 POU and Task When using DVPxxMC/ AS5xx series in project, the same POY can be reassigned to multiple tasks and be reassigned in the same task too (see below). 5.5.3 POU Order When POU configuration is complete under the Task list, these POUs need to be arranged in execution order. (1) If users want to execute a POU in the Assigned POUs section earlier, they can select the POU in the Assigned POUs section, and click to move the POU upward. (2) If users want to execute a POU in the Assigned POUs section later, they can select the POU in the Assigned POUs section, and click to move the POU downward. 5-37