82E-5 – 98E-5 series engines — 4.4.4 SERVICING POINTS

4. DISASSEMBLY, INSPECTION AND REASSEMBLY OF ENGINES [Reassemble] Apply sealant (Part No.YM 977770-01212) and install the mounting flange by matching the two dowel pins. After assembly, raise the engine with its mounting flange on the bottom side. Unforeseen injury may arise due to falling of slipping when raising or reversing the engine. Carefully operate so as not to lose balance. Point 4: Journal bearing cap [Disassemble] Before removing the journal bearing, measure the crankshaft side gap. Measure it in either method because there are the next two meth- ods.

1) Install a dial gauge on the cylinder block, and move a crankshaft in front and back, and measure the side gap as shown in the right figure. 2) Put a thickness gauge in the clearance between thrust metal and crankshaft directly, and measure it. Side gap standard mm [Reassemble] If the side gap exceeds the standard, replace the thrust metal with an oversize one. Machine the standard width of the crankshaft thrust part into the dimension of the below table at the same time. Refer to a parts book when ordering the part. The surface finishing precision (refer to 4.4.5(2) in Chapter4):

1.6 0.25mm Oversized thrust metal (0.25DS) mm The standard width of the crankshaft thrust part mm 82E-5 – 98E-5 SERIES 4-35 Model Standard Limit All models 0.13 – 0.23 0.28 0.25DS Thrust metal ass’y No. Standard thickness 3D82AE YM119810-02940 2.055 – 2.105 (S)3D84E, (S)4D84E, 3D88E, 4D88E YM129150-02940 2.055 – 2.105 4D94LE, (S)4D98E YM129900-02940 2.055 – 2.105 0.25DS Standard thickness 3D82AE 25.250 – 25.271 (S)3D84E, (S)4D84E, 3D88E, 4D88E 28.250 – 28.271 4D94LE, (S)4D98E 32.250 – 32.275