Inserting a Scope View 4 Inserting a Scope View The way in which a Scope View element can be inserted into the tree structure is described under " General operating facilities [ } 10] ". Click on "Add a Scope View.." , which will open the following dialog: It is possible to choose here whether the plot should be drawn against time, or whether an XY presentation should be generated. After a Scope View element has been inserted into the tree structure, the right hand side initially shows an empty Scope View, i.e. one that does not yet contain any channels. However, before a channel is added, the properties of the Scope View should be resolved.
The individual property pages are described for this purpose below. If you now quickly want to record channels, you can in fact go straight to the chapter on " Inserting a Channel [ } 15] ", and continue there using the default settings for the properties of the Scope View. General Scope View 11 Version: 1.1