Turn the flywheel until No. 1 piston is placed in the “OT” position of notch marks on the flywheel, and then turn again the flywheel clockwise until showing the notch mark of the right figure corresponding to the injection timing is aligned with the pointer ( ) on the flywheel housing Timing check hole Injection timing notch mark Flywheel ring gear EE6OM030 Turn the timer until the notch mark of the indicator plate attached to the fuel injection pump is aligned with the notch mark of the timer. EE6OM013 Tighten the Coupling fixing bolts and nuts to specified torque. Tighten the drive shaft connecting flange fixing bolts to specified torque Install the oil delivery pipe and return pipe.
EAMD021I - 93 - REASSEMBLY Torque 6.0 kg.m Torque 7.5 ~ 8.5 kg.m