EBA00017 9. THROTTLE HOUSING A: Align the projection on the throttle housing with the end of the front brake master cylin- der. B: Tighten the screws in stages and maintain an equal gap on each side of the throttle hous- ing bracket. C: Check the throttle lever for smooth action. FBA00017 9. LOGEMENT DE CBBLE DES GAZ A: Aligner la saillie du logement de cвble des gaz et l’extrйmitй du demi-palier de maotre-cylindre. B: Serrer les vis par йtapes et veiller а conserver un йcart йgal de cha- que сфtй du demi-palier du loge- ment de cвble des gaz. C: Contrфler le bon fonctionnement du levier des gaz. A 1 C B 2 3 Proper cable routing is essen- tial to assure safe vehicle oper- ation.
Refer to “CABLE ROUTING”. Le cheminement correct des cвbles est indispensable а la sйcuritй du vйhicule. Se reporter а “CHEMI- NEMENT DES CBBLES”. EBA00023 10. HANDLEBAR SWITCH FBA00023 10. COMMODO 1 Proper cable routing is essen- tial to assure safe vehicle oper- ation. Refer to “CABLE ROUTING”. Le cheminement correct des cвbles est indispensable а la sйcuritй du vйhicule. Se reporter а “CHEMI- NEMENT DES CBBLES”. 2 WARNING AVERTISSEMENT 1 (3)-V 1 2 (3)-V 1 3 (3)-V 2 d = 5 (0.20) , = 20 (0 .79) WARNING AVERTISSEMENT 1 (2)-V 1 2 (2)-V 2 d = 5 (0.20) , = 35 (1 .38)