OPERATION Pin - attribution LBS-ISO implement socket rear and front ABS socket (A) Operation_Pic_number:1 Operation_Pic_number:1 Fig.32 Fig.31 1 = + UB 30 2 = + UB 15 3 = Earth electronics 4 = Earth tractor body 5 = Indicator lamp A = LBS-ISO socket for the mounted implement. B = LBS-ISO connector for the mounted implement. Pin 1 = Earth 60A. Pin 2 = Earth 25A. Pin 3 = 60A power supply. Pin 4 = 25A power supply for implement electro- nics. Pin 5 = Control signal for switching the end sy- stem, bridged with pin 4 in the connector. Pin 6 = CAN-EN. Pin 7 = CAN GND. Pin 8 = CAN High. Pin 9 = CAN Low. IMPORTANT:
When turning the ignition ON or OFF, the in- dicator lamp (B) in the instrument panel must light up briefly for monitoring purposes. Operation_Pic_number:1 Fig.33 Socket (A) at front (with front power lift only). Operation_Pic_number:1 Fig.34 LBS-ISO socket (A) front (optional). 30