omron — 7.3.2. Connecting Online and Transferring the Project Data

7 . EtherNet/IP Connection Procedure 24 11 A confirmation dialog box is displayed. Confirm that there is no problem and click the Yes Button. A screen stating "Synchronizing" is displayed. A confirmation dialog box is displayed. Confirm that there is no problem and click the No Button. * Do not return it to RUN mode. 12 Confirm that the synchronized data is displayed with the color specified by "Synchronized", and that a message is displayed stating "The synchronization process successfully finished". If there is no problem, click the Close Button.

* A message stating "The synchronization process successfully finished" is displayed if the Sysmac Studio project data and the data in the Controller match. * If the synchronization fails, check the wiring and repeat from step 1.