HOME ASSEMBLY NOTE A lubricant, such as tire soap or detergent and water, can be used to lubricate the hose to aid in pushing hose over neck beads. TOOL NAME PART NUMBER ROBINAIR HEAT GUN HD-25070 1. See Figure 5-16 . If removed, thread the air bleed plug (5) with new seal (6) into the coolant outlet pipe (3). When checking coolant level, motorcycle is checked on jiffy stand. 3. With hose cover (16), clamp (14), and bright clamp (12) loose on hose, install coolant inlet pipe (2). 2. Remove new shrink clamp (9) from packaging brace by squeezing band to collapse, then fold in half and remove from cardboard. Slide shrink clamps over hoses. 4.
With embossed arrow (11) pointing towards front and on top, push hose (13) over neck bead of radiator outlet and push hose (20) over water pump inlet neck. 3. Orient radiator hoses with embossed arrow (11) on top and towards front. Push hose over fitting beads on coolant inlet and coolant outlet pipes (2, 3). 5. Use a long thin SCREWDRIVER (Part No. SNAP-ON SDD1410) to tighten clamps (12, 14) to 3-4 Nm (27-35 in- lbs ). 4. Orient shrink clamps (9) so print on the clamp is visible after shrinking. Slide clamp over end of hose to overlap the bulge formed by fitting bead of coolant pipe. 6. Install p-clamp (8) and pipe clamp (4) over both pipes.
Tighten pipe clamp (4) to 6.5 Nm (57 in-lbs ) and tighten p-clamp to 6-10 Nm (53-88 in-lbs ). NOTE Do NOT use open flame to shrink clamp. Using an open flame could result in uncontrolled melting of clamp. 5. Using a ROBINAIR HEAT GUN (Part No. HD-25070) or similar tool, apply heat to shrink clamps (9). Move heat tool around clamp continuously to prevent burning. 7. Install overflow bottle with overflow hose and cap (19) to grommets on frame). 8. Install and clamp overflow hose to filler neck and overflow bottle. NOTE Heated area must cover at least 1/3 of clamp surface.
If heating shrink clamp while hose and pipe are still mounted in motor- cycle, take care not to damage surrounding components. 9. Pressure test to 103 kPa (15 psi). 10. Install air filter bottom, velocity stacks, O-rings, and breather hose. See 1.5 AIR CLEANER AND EXHAUST 6. NOTE in-lbs ) and install 7. Repeat for each shrink clamp required. INSTALLATION 13. Install the negative battery cable. Tighten to 6.8-10.8 Nm (60-96 in-lbs ). TOOL NAME PART NUMBER SCREWDRIVER SNAP-ON SDD1410 14. Install air filter, air filter top and air box cover. 1. See Figure 5-16 . With upper black clamp (14) on hose (15) and lower black clamp (14) loose, install coolant outlet pipe (3). 15.
Install right side cover and maxi-fuse. 16. Rinse motorcycle with water to remove any spilled coolant. 2. With embossed arrow (11) pointing towards front and on top, push hose (10) over neck bead of radiator inlet neck. Push hose (15) onto outlet neck of thermostat housing. 17. After running engine, check coolant level in overflow bottle with coolant cold. If level is below COLD FULL line, remove cap from overflow bottle and add antifreeze until fluid level reaches COLD FULL line. 18. Continue to run engine, check level, and add antifreeze until fluid level remains at COLD FULL line. 5-16 2009 VRSC Service: Cooling System and remove heat. on fitting by hand ing reasonable to quired. SYSTEM.
. 11. Loosen air bleed plu IDSON EXTENDED . Hose through filler neck. rque. 12. Tighten air bleed plu