Iveco — Руководство по ремонту Iveco Trakker Euro 4/5 (EN)

F3B ENGINE 215 T RAKKER E URO 4/5 PRINT603.93. 641  Figure 185 - Closing to angle with tool 3 rd phase: angle of 90 4 th phase: angle of 65 . Figure 186 Mount the oil pump the link rod (1) and the PTO Tighten the screws (4) to the required Fitting flywheel housing Figure 187 Apply LOCTITE 5970 IVECO flywheel using appropriate tools Print 603.93.641 Base q November 2006 NOTE Mount the gear housing within 10 min. of applying the sealant. Figure 188 60633 Using a torque wrench, tighten the highlighted screws with the following sequence and torque:

10 screws M12 x 1.75 x 100 56 to 70 Nm 2 screws M12 x 1.75 x 70 56 to 70 Nm 4 screws M12 x 1.75 x 35 56 to 70 Nm 1 screw M12 x 1.75 x 120 56 to 70 Nm : 2 screws M 12 x 1.75 x 193 56 to 70 Nm Figure 189 60568 Key on the gasket (1), fit the key 99346251 (2) and, screwing down the nut (3), drive in the gasket. 60566 99395216 (1): 71773 iddle gears (2) together with riving gear (3). required torque. 47592 No. 2995644 silicone on the ls (1) as shown in the figure.