HP — 3.2 Removing and reinstalling the up/down wire

Q5690A TRAY UP/DOWN 12. Remove the E-ring [1] and then remove the drive pulley [3] while releasing the winding of the [10] [11] 13. Remove the up/down wire A [2] from the up/ up/down wire /A [2]. [12] [2] [9] [8] down drive shaft [4]. [2] 14. Remove the up/down wire A [2] from the guide pulleys [5], [6] and [7]. Note: [6] • When removing the up/down wire A [2] [7] installed onto the guide pulleys [5], [6] and [7], be sure to pull out the wire from a notch [8] provided on the side of each pulley to move the wire cover [9] of each pulley to the loca- tion where the notch [8] can be avoided. 15. Remove a screw [10] and then remove the up/ [4] down wire protective cover [11]. [3] [5] [2] 16.

Pull out the up/down wire A [2] from the upper surface [12] of the HCI engine to remove it. III DIS./ASSEMBLY [8] [2] [9] [3] [2] [4] [1] 3-17