Installation 15 The extractor hood is designed to be mounted on the wall. During installation, optional accessories may also require fitting. Observe the minimum distance between hob and extractor hood (see ”Safety instructions”)! Avoid damaging the sensitive surfaces! Preparing the wall RISK OF INJURY, DAMAGE TO PROPERTY Before drilling the holes for the designated installation location, check for concealed electrical cables and other lines. The wall must be level and vertical. The enclosed screws and wall plugs are suitable for solid brickwork. Use the appropriate fixing materials for other wall structures (e.g. plaster board, porous concrete, poroton bricks).
Ensure that the wall has adequate load bearing capacity. Ensure that the depth of the drilled holes corresponds with the length of the screws. Ensure that the wall plugs are secure. Max. weight in kg: 40 Design subject to modifci ation in line with technical development. Installation preparations 1. Mark a centre line on the wall from the ceiling to the lower edge of the extractor hood. 2. Using the enclosed template, mark positions for the screws and, to facilitate attachment, the contour of the attachment area. The lower edge of the template corresponds to the lower edge of the extractor hood. 3.
Drill 2x 8 mm holes for attachment of the extractor hood and 2x 8 mm holes for the fxi ing bracket for the ful e duct and press in wall plugs ful sh with the wall. 4. Screw on the fixing bracket for the flue duct. 5. Screw on the brackets for the extractor hood: hand tight, max. 3 Nm. Ensure that the washers and brackets are positioned correctly!