AH500 Operation Manual M1 to ON, and then set values for D0~D9. Users can check whether data exchange is preformed correctly by comparing the data in D0~D9 with the data in D100~D109. Method 2: If users write a program, they will spend much time setting special data registers and special auxiliary relays. It is more convenient for users to construct a PLC Link by means of NWCONFIG in ISPSoft. (Please refer to section 11.1.2 for more information about NWCONFIG in ISPSoft.) Step 1: After users double-click the RS-485 network in the NWCONFIG window, the PLC Link Table Editor window will appear. The users have to select Station address 1 CPU530-RS2 in the Master Device drop-down list box. 11-28