Delta Electronics AH500 — 11.2.1.2 Steps of Constructing an Ether Link

Chapter 11 Convenient Functions AH1 AH2  Flexible control There are three start modes. (1) Always Run : When the PLC runs, data exchange is performed. (2) Always Stop : During the operation of the PLC, no data exchange is performed. (3) SM Flag : The performance of data exchange depends on a special auxiliary relay in the PLC. Users can set the start mode of an Ethernet port. They can operate an Ethernet port flexibly.  Simple setting Users can construct an Ether Link and a PLC Link by means of NWCONFIG in ISPSoft. After users create a network framework in NWCONFIG, they can create a data exchange table.

Users can add devices and storage blocks which are involved in data exchange according to the actual framework. The setting can be downloaded to a PLC by the software. Users do not have to memorize registers.  Elimination of errors The execution of an Ether Link can be monitored by ISPSoft. Users can know the operating status of a PLC. The ports on a PLC and the storage blocks involved in data exchange are displayed. Besides, the error log displayed helps users eliminate errors. 11.2.1.2 Steps of Constructing an Ether Link 1. Plan a network architecture. 2. Connect PLCs to network cables according to the network architecture planned, and power the PLCs up. 3.

Assign IP addresses and subnet masks to the Ethernet ports on the PLCs which will be involved in data exchange by means of HWCONFIG in ISPSoft. (The PLCs which will be involved in data exchange must be in the same domain.) 4. Create the network architecture planned in NWCONFIG in ISPSoft. Assign IP addresses and subnet masks to the machines which will be involved in data exchange. (Note: The IP addresses/subnet masks assigned in HWCONFIG and the IP addresses/subnet masks assigned in NWCONFIG must be the same. Otherwise an error will occur if the Ether Link constructed in NWCONFIG is executed.) 5. Create a data exchange table. (Please refer to section 11.2.2 for more information.) 6.

Download the data exchange table, and monitor the execution of the Ether Link constructed in NWCONFIG. 7. The construction of an Ether Link is finished. 11-35 M M D D L L