Delta Electronics — 7.1.6 PR procedure execution flow

ASDA-B3 Motion Control  Speed command  Speed command (I)  Speed command When the PR executor receives three consecutive Speed commands with an interrupt in the second command, the executor treats the first and the second as one PR group. Since the first Speed command is not executed, the executor replaces the first command with the second and 7 only sends the second command to the motion command generator for execution. After the second command is complete, the executor sends the third command to the generator (see Figure 7.1.6.8 (a)). If the first command includes a delay, then the PR executor sends the first command to the generator and then starts counting the delay time.

After the delay is over, it then sends the second command and the generator starts the second part of speed control. While the first command is still being executed, it is integrated with the second command. Once the second command is complete, the executor sends the third to the generator for execution (see Figure 7.1.6.8 (b)).

( 1 ms command cycle ) (1 ms command cycle) PR#1 PR#2 (I) PR#3 PR executor Speed Speed Speed 100 rpm Acc=[11] 100 ms Dec=[11] 100 ms DLY=[0] 0 ms 200 rpm Acc=[12] 333 ms Dec=[12] 333 ms DLY=[0] 0 ms 500 rpm Acc=[0] 33.3 ms Dec=[0] 33.3 ms DLY=[0] 0 ms 500 Motion command generator 200 Time (a) Speed command without delay (1 ms Cmd cycle) (1 ms Cmd cycle) (1 ms Cmd cycle) PR executor Speed PR#1 PR#2 (I) Speed Speed PR#3 DLY=[1] 100 ms DLY=[0] 0 ms DLY=[0] 0 ms 100 rpm Acc=[11] 100 ms Dec=[11] 100 ms 200 rpm Acc=[12] 333 ms Dec=[12] 333 ms 500 rpm Acc=[0] 33.3 ms Dec=[0] 33.3 ms 500 Motion command generator 200 100 Time 100 ms (b) Speed command with delay Figure 7.1.6.8 Internal interruption - Speed command 7-53 d (rpm) d (rpm)