Komatsu — Pushing operation

3.3 Operation Operation Leveling operation NOTE ! Always operate the machine in reverse when carrying out leveling operations. If it is necessary to carry out leveling operations when travel- ing forward, do not set the bucket dumping angle to more than 20 degrees. ! Turn the E.C.S.S. switch (option) OFF when carrying out lev- eling operations. 1. Scoop soil into the bucket. Move the machine backward while spreading soil from the bucket little by little. GK032210 2. Go over the spread soil with the bucket teeth touching the ground and level the ground by back-dragging. 3.

Scoop some more soil into the bucket, put the lift arm control lever in FLOAT position, level the bucket at ground level, and smooth the ground by moving backward. Pushing operation Never set the bucket to the DUMP position when carrying out pushing operation. When carrying out pushing operations, set the bottom of the bucket parallel to the ground surface. 3-126 WA380-6H – VEAM440100 CAUTION CAUTION