TM 5-3805-280-10 Operating the Machine With bucket loop: Fasten sling/chain to bucket loop (A), bucket curled and arm retracted. 3. Coordinate hand signals with your signal man before starting. 4. Know location of all persons in working area. 5. Attach a hand line to load and make sure person holding it is away from load. 6. Before starting job, test your load. Park your machine close to load. Attach load to machine. Raise load 50 mm (2 in.) above the ground. Swing the load all the way to one side. While keeping load close to the ground, move it away from machine. If there is any indication of reduced stability of your machine, lower load to the ground. T6866AC –UN–19OCT88 7.
Lift load only as high as necessary. With Bucket Loop TX,35,DH5145 –19–10AUG96–2/2 7-31