DISASSEMBLY AND ASSEMBLY TRACK ROLLER REMOVAL OF TRACK ROLLER ASSEMBLY 1. Lower work equipment to ground, then loosen lubrica- tor (1), and relieve track tension. 1 The adjustment cylinder is under extremely high pressure, so never loosen the lubricator more than one turn. If the grease does not come out easily, move the machine backwards and for- wards. 2. Remove mounting bolts of track roller guard (2), then swing work equipment 900, jack up machine with work equipment, and remove track roller guard (2) towards outside of machine. 2 Track roller guard: 35 kg 3.
Lower chassis completely, remove mounting bolts of track roller assembly (3), then jack up machine with work equipment, and remove track roller assembly (3) to outside of machine. 3 Track roller assembly: 55 kg INSTALLATION OF TRACK ROLLER ASSEMBLY Carry out installation in the reverse order to removal. 1 # Adjust the track tension. For details, see TEST- ING AND ADJUSTING, Testing and adjusting track tension. 2 Roller guard mounting bolt: Thread tightener (LT-2) Roller guard mounting bolt: 926.7 ± 103.0 Nm (94.5 ± 10.5 kgm) 3 Track roller mounting bolt: Thread tightener (LT-2) Track roller mounting bolt: 1st pass: 196.1 ± 19.6 Nm (20 ± 2 kgm) 2nd pass: Tighten an additional 105 ± 5° 30-73