Komatsu — eebm001902 a3.pdf

DISASSEMBLY AND ASSEMBLY BOOM BOOM Removal 1. Remove bucket and arm assembly. For details, see BUCKET- ARM, Removal. 2. Lower boom assembly completely to the ground and set safety lock lever to LOCK position. 3. Disconnect grease hose (1). 4. Sling boom cylinder assembly (2), and remove lock bolt (3). 5. Remove plate, then remove head pin (4). 1 2 # There are shims installed, so check the number and thickness, and keep in a safe place. 6. Start engine, and retract piston rod, then tie piston rod with wire to prevent it from coming out, and lower it onto block. # Disconnect the boom cylinder on the opposite side in the same way. Release the remaining pressure in the hydraulic cir- cuit.

For details, see TESTING AND ADJUSTING, Re- leasing remaining pressure in hydraulic circuit. 7. Disconnect hoses (5) and (6), and secure to valve with rope. # Hoses (6) are for machines equipped with an addi- tional attachment circuit. 8. Disconnect wiring connector (7) for working lamp. 9. Raise boom assembly and remove plate, remove foot pin (8) using tool P , then remove boom assembly (9). # There are shims installed, so check the number and thickness, and keep in a safe place. 3 Boom assembly: 2040 kg 30-129