. OPERATION TRANSPORTATION OPERATION TRANSPORTATION 3 - 185 5. Pass w ire ropes bet ween the 1st and 2nd track r ollers from t front an d between t he 1st an d 2nd t rack rollers Howev er, for machi nes equip ped wit h a full rolle r guard for t track ro ller, p ass th e wire rop e unde r the track. 6. Set the lifting angle e wire r ope to 30° t the ma chine slowly. 7. After t he machine conditi on and the lif ting postu re, and then lift slo Machines With Lifting Hook In the case of machines equippe d with a lifting hook , it is possible to lift the m achine as foll 1. The lifting hooks are at the positions shown in the diagram on the right. 1.
The lifti ng hooks are at the p ositions shown in t he diagram the righ 2. shown in the diagra m on th e right. (Boom full bucket fully p ulled in ) set the upper s tructure fac ing straigh the fron t. (Idler end 3. Set the lock l ever s ecurely to the LOCK position . 4. Stop th e engine, ch eck that t he area around the operator's cab is safe, t hen get down f rom the machine Close t he ca b door, front gla ss, left and right do ors, and engin e hood securely. ope. 5. Install s hackles to t he lifting hooks o n top of the boom and counterweigh t, then fit wire r