Komatsu — LIFTING MACHINE

. OPERATION TRANSPORTATION OPERATION TRANSPORTATION 3 - 186 6. As hown in th e diagram on t he right, ect he wire rope so that l ifting poin t (A) is directly above t he ce nter of gravity ( B) (a poin t 490 mm (19.3 in) to the rea r of the s wing center) (A): Lifting poi (B): Center of (C): Swing cen (D): 320 mm ( (E): Min. 5 m ( 16 ft 5 in (F): Min. 1.5 m (4 ft 11 in) (G): Min. 3.4 m (11 ft 2 in) 7. Whe n lifting th e machine, check t hat there is no change in th e posture of the work equipment caused by le akage of oil from the hydraulic circui t at the boo m cylinder head end. 8. Whe n the mac hine come s of f the ground he lifting whe n the mac hine stabilizes, lift i t slowly.

check that