E-13: INSTALLATION OF BOOM CYLINDER TOP PIN 1. Remove the stoppers fixed to the boom, then re- move the boom cylinder top pin. E!?? kg Boom cylinder top pin: 42 kg 2. Start the engine and run at low idling. 3. pin hole, then push in the pin. Raise the cylinder, extend the rod slowly, align the inder top is at the bottom.) (install so that the greasing hole at the boom cyl- 4. boss and the end of the boom boss, determine the Check the clearance between the end of the cylinder then install the shims. shim thickness to make the clearance 2 - 3 mm, 5. Knock in the cylinder top pin. &?&z Inside of bushing: Anti-freeze compound (LM-P) 6. Install the left and right cylinders in the same way. 7.
Install the stopper. * When operating the cylinder, extend it slowly. (Tightening torque of bolt M16: 15 - 31.5 kgm) it to the end of its stroke. Do not operate the cylinder suddenly or operate At first there is air inside the cylinder, so the cylinder may not move for the first ten seconds. In such cases, do not operate the lever to the end of its travel. 117