D-l: ASSEMBLY OF BOOM ASSEMBLY 1. Remove the boom foot pin stopper fitted to the Shim chassis, and pull out the pin. 2. to the chassis, and pull out the pin. Remove the boom cylinder foot pin stopper fitted * Use a forcing screw (Dia. = 24 mm, Pitch = 3.0 mm) to remove the pin. 3. Raise the boom assembly with a crane and align it M with the pin hole in the chassis. &I kg Boom assembly: 9600 kg (9200 boom) 8900 kg (7900 boom) 9300 kg (7500 boom) 4. right.) Install the boom foot pin. (See the figure on the frame end) on one side as far as it will go, then align Insert the boom foot pin (installed at the revolving the pin hole on the other side.
When doing this, if the boom is tilted to the left or right, use a jib crane to balance the boom. * Four seals (209-72-I 1311 x 4) are assembled to the boom foot as shown in the figure below. damage the seals. When pushing in the pins, be careful not to * Check the clearance of the boom foot and the outside of the machine. Decide the thickess of the adjustment shims to make the clearance less than 1 mm, and fit the shims. Combine the following shim thicknesses to make the shim adjustment. (%2lN-72-11220x3) t1.5 (%21N-72-11210x3) tl.O the left side of the boom.) (Adjust with shims at one place on the outside of Parts sent individuallv Part No.
I Part Name I Q’tv 21N-72-11210 Shim (tl.0) 3 21 N-72-l 1220 Shim (t1.5) 3 5. Insert the boom foot pins completely on both the a Inside of bushing: Anti-friction compound left and right, then install the lock plates. (LM-P) 72