D-10: ~IN~TALLATION OF ARM AND ARM CYLINDER TOP Tools and facilities required Parts sent individuallv Part No. I Part Name O’tY 21N-72-11210 1 Shim (tl.O) I 4 boom, then pull out the top pin. Remove the boom top pin stopper fixed to the Align the arm cylinder top pin hole with the arm hole, then insert a shim (%21N-72-11210) (tl.0) to make the clearance less than 2 - 3 mm, and push in &I kg Boom top pin: 135 kg & kg Arm assembly (with link, cylinder): the pin. 5000 kg 5500 kg (SE spec.) 5800 kg (SP spec.) & Inside of bushing: Anti-friction compound (LM-P) Install the stopper.
then insert a shim (?%21N-72-11210) (0.0) to make Raise the arm assembly, align with the boom hole, When operating the cylinder, extend it slowly. Do the clearance less than 1.0 mm, and push in the pin. * There are 2 seals (209-72-11311) installed inside not operate the cylinder suddenly or operate it to the the bushing at the arm end, so be careful not to end of its stroke. At first there is air inside the cylinder, so the cylinder damage them when pushing in the pin. cases, do not operate the lever to the end of its travel. may not move for the first ten seconds. In such 4 Inside of bushing:
Anti-friction compound (LM-P) When installing the arm, be extremely careful that the bucket cylinder rod does not fly out. Install the stopper. the arm, then pull out the top pin. Remove the arm cylinder top pin stopper fixed to C?l kg Arm cylinder top pin: 70 kg Start the engine and run at idling, then extend the arm cylinder piston rod slowly to align the pin hole. crane and operate the arm cylinder at the same time (When doing this, raise the arm cylinder with a to align the position.) Be careful of the position of the arm cylinder rod grease hole. Assemble so that the grease hole is at the top. 83