Komatsu — D-11: WORK EQUIPMENT PIPING (BOOM-BUCKET CYLINDER)

D-l 1: WORK EQUIPMENT PIPING (boom - bucket cylinder) Precautions 1) transportation in a safe place so that they can be Keep the flanges, O-rings, and heads used during 2) When connecting the hoses, be careful not to get the used again. 3) O-rings caught. Install the hoses without twisting or interference. 1. Remove the short circuit for flushing the bucket cylinder hoses. 2. et cylinder end, fit new O-rings (%07000-13048 x Remove the blind plugs from the tubes at the buck- 41, then connect the bucket cylinder hoses (07098- 21420 x 2). Use the same split flanges and bolts again. Parts sent individually Part No. Part Name Q’ty 07098-21420 Hose 2 07000-l 3048 O-ring 4 at cylinder used end 84