D-12 : ASSEMBLY OF BUCKET ASSEMBLY r&l kg Bucket assembly: 4000 kg (STD spec.) 5400 kg (SE, SP spec.) 1. Remove the stoppers of the bucket-arm connect- ing pin (fixed to the arm) and bucket-link con- necting pin (fixed to the link), then remove each pin. 2. Fit the bushing (% 21N-70-14220) (sent sa an in- dividual part) and O-rings (% 21N-70-13150 x 2) to the bucket boss. 3. Start the engine, run at idling and operate the boom and arm cylinders slowly to align the po- sition of the holes for the bucket-arm connect- ing pins. Parts sent individually Part No.
I Part Name IQ-W 21 N-70-14220 Bushing 1 21N-70-14230 Shim (tl .O) 14 21N-70-14320 1 Shim (tl.O) (SE, SP) 1 1 21N-70-14330 Shim (t0.5) (SE, SP) 4 21 N-70-14240 Shim (t0.5) I 4 21N-70-13150 O-ring 2 21 N-70-1 1230 Shim (tl.O) 3 85