OPERATION MACHINE OPERATIONS AND CONTROLS 3. Install the bucket inversely. After the bucket is inversed, correct the inclination and direction of the retaining pin holes (1) and (2) and stabi- lize the bucket securely. 4. Align the arm with holes (1) and the link with holes (2), then install grease coating pins (A) and (B). REMARK Install the O-rings into retaining hole (1) of the arm and bucket. When installing the bucket, the O-rings are easily damaged, so fit the O-rings on the boss of the arm end as shown in the dia- gram. When knocking the pin, move the O-ring down to the regular groove. 5. Install the ring plates and stopper pins to each pin.
Add grease through fittings (D), (E), and (F)(total: 5 points) on the bucket link. 3-75