OPERATION TRANSPORTATION 5. Turn the swing lock switch ON to apply the swing lock. NOTICE Turn the swing lock switch ON to apply the swing lock. 6. Set the machine facing the ramps and travel slowly. Keep the work equipment as low as possible without let- ting it hit the trailer when loading or unloading the machine. When the work equipment is installed, load machine from the front; when no work equipment is installed, load the machine from the rear. When on the ramps, do not operate any lever except the travel lever. 7. Turn the switch lock switch OFF to reset the swing lock. Turn the upper structure slowly by 180є. 8. Load the machine correctly in the specified position on the trailer.
3-87