Komatsu — TRACK SHOE BOLTS-CHECK/TIGHTEN (MACHINE EQUIPMENT WITH STEEL SHOES,ROAD LINERS)

MAINTENANCE PROCEDURE MAINTENANCE Track Shoe Bolts - Check/Tighten (Machine equipped with steel shoes, road liners) If the machine is used with track shoe bolts (1) loose, they will break, so tighten any loose bolts immediately Steel Track Shoe Bolts - Check/Tighten 1. First tighten to a tightening torque of 118 ± 19.6 N•m (12 ± 2 kgf•m, 87 ± 14.5 lbft) then check that the nut and shoe are in close contact with the link contact surface. 2. After checking, tighten the steel shoe a further 90є ± 10є.

Road Liner Mounting Bolt - Check/Tighten Tighten to a tightening torque of 196 ± 19.6 N•m (20 ± 2 kgf•m, 144.7 ± 14.5 lbft) then check that the nut and shoe are in close contact with the link contact surface. Tightening Order (Machine equipped with steel shoes, road liners) Tighten the bolts in the order shown in the diagram on the right. After tightening, check that the nut and shoe are in close con- tact with the link mating surface. 4-26