MAINTENANCE PROCEDURE MAINTENANCE EVERY 1000 HOURS MAINTENANCE Maintenance for every 50, 100, 250 and 500 hours service should be carried out at the same time. Swing Machinery Case Oil - Change WARNING The parts and oil are at high temperature after the engine is stopped, and may cause serious burns. Wait for the temperature to go down before starting the operation. Container to catch drained oil: Min. 1.5 liters Refill amount: 1.5 liters (0.40 US gal, 0.33 UK gal) 1. Set an oil container under drain valve (P) at the bottom of the machine. 2. Loosen drain valve (P) at the bottom of the machine and drain the oil, then tighten the drain valve again.
Tightening torque of drain plug :44.1 to 93.2 N•m (4.5 to 9.5 kgf•m, 32.5 to 68.7 lbft). 3. Remove dipstick (G) and air bleed plug (1), then add the specified amount of engine oil through filler port (F) of the dipstick guide. 4. After adding oil, install air bleed plug (1). 5. Wipe off the oil on the dipstick with a cloth. 6. Insert dipstick (G) fully into the dipstick guide, and then pull it out again. 7. The oil level should be between H and L marks on the dipstick (G). If the oil does not reach the L mark, add engine oil through oil filler port (F). 8. If the oil level is above the L mark, drain the excess engine oil from drain plug (P), then check the oil level again. 4-66