MBE 4000 SERVICE MANUAL 3. Fit the engine cranking tool (J 46167 or 407 589 00 63 00) into the inspection hole on the flywheel housing. See Figure 12-3. 1. Inspection Cover Figure 12-3 Placement of Engine Cranking Tool 4. For each cylinder, use the cranking tool (J 46167 or 407 589 00 63 00) to turn over the crankshaft until the piston is exactly at top dead center (TDC) in the compression stroke. The valves must be closed and it must be possible to turn the pushrods without effort. NOTE:
When the piston in cylinder #1 is at ignition TDC, the valves of cylinder #6 will overlap, meaning that both intake and exhaust valves are partially open, and show no measurable play when tested with a feeler gauge. 5. Check each valve and adjust it (if necessary), using the procedures under the heading "Adjusting Valve Lash." 6. For each valve, measure the valve lash with a feeler gauge between the rocker arm and valve bridge. It should be possible to pull the feeler gauge through with no more than light resistance. All information subject to change without notice. 6SE412 0403 Copyright © 2004 DETROIT DIESEL CORPORATION 12-5