Detroit Diesel — Print Preview - C:\Temp\APTCACHE\6SE412A\6SE412A Detroit Diesel

1.2 CYLINDER HEAD 5. Using the head bolt impact socket (J 45389 or 422 589 00 09 00), install the cylinder head bolts. NOTE: For the correct tightening sequence, see Figure 1-7. Listed in Table 1-4 are the specific stages in the tightening sequence. Figure 1-7 Tightening Sequence, Cylinder Head Bolts Table 1-4 Tightening Stages, Cylinder Head Bolts NOTE: If the stretch bolt tightening torque is exceeded, remove it, check its maximum permissible shaft length (replace if necessary), and tighten it from Stage 1. Unconditionally replace all bolts whose shaft length exceeds the maximum permissible value. 6. Replace the seal rings and connect the fuel return line to the cylinder head. 7.

Replace the seal rings and install the constant-throttle line on the cylinder head. All information subject to change without notice. 1-12 6SE412 0403 Copyright © 2004 DETROIT DIESEL CORPORATION Size Max. Shaft Length Tightening Stage Torque Value (Repair work in the field) M15 x 2 212.0 mm (8.35 in.) Stage 1 10 N·m (7 lb·ft) Stage 2 50 N·m (37 lb·ft) Stage 3 100 N·m (74 lb·ft) Stage 4 200 N·m (148 lb·ft) Stage 5 90 more Stage 6 90 more