Komatsu — STANDARD SPECIFICATION MACHINE

TRANSPORTATION OPERATION 4. Pass wire ropes between the 1st and 2nd track rollers from the front and between the 1st and 2nd track rollers from the rear. However, for machines equipped with a full roller guard for the track roller, pass the wire rope under the track. 5. Set the lifting angle of the wire rope to 30є to 40є, then lift the machine slowly. 6. After the machine comes off the ground, check carefully that the machine is balanced, then lift slowly. REMARK For machines equipped with lifting hooks, raise the machine as follows. 1) Start the engine and set the work equipment to the posture shown in the diagram on the right.

(Boom raised fully, arm, bucket pulled in fully.) Set the upper structure facing directly to the front (idler end). 2) Set the safety lock lever to the LOCK position. 3) Stop the engine, check that the area around the machine is safe, then get down from the machine. Close the cab door window and front window, left and right doors, and engine hood securely. 4) Install shackles to the lifting hooks on the boom and the top of the counterweight, then fit the wire rope. 5) Select the wire rope so that lifting position P is imme- diately above the center of gravity of the machine (a point 400 mm (15.8 in) behind the swing center) as shown in the diagram on the right.

6) When lifting, check that leakage of oil in the hydrau- lic circuit at the head end of the boom cylinder does not cause the posture to change. 7) When the machine leaves the ground, stop the lifting operation and check that the machine is balanced. When the machine becomes stable, continue the lift- ing operation. 3-114