DISASSEMBLY AND ASSEMBLY COUNTERWEIGHT 12 COUNTERWEIGHT Removal 1. Set eyebolts ➀ to counterweight assembly (1), and sling. 2. Remove mounting bolts (2) and (3). # Be careful not to lose the shims when removing. 3. Lift off counterweight (1) horizontally with wire or chain block. # Be careful not to hit the engine, radiator and cooler assembly. Counterweight assembly: PC200 . . . . . . . . . . . . . . 4,880 kg PC220 . . . . . . . . . . . . . . . . 6,481 kg Installation G Carry out installation in the reverse order of removal. Thread of mounting bolt: . . . . . . . Thread tightener (LT-2 ) Mounting bolt: . . . . . . . . .
1,323 ± 147 Nm (135 ± 15 kgm) # Installing and adjusting counterweight 1. Sling counterweight with crane and set in position on frame. 2. Push counterweight and install shim and mounting bolts (2) and (3), and adjust to following dimensions. A. Clearance from revolving frame: . . 10 ± 5 mm (left and right) B. Clearance from bodywork door: . . 10 ± 5 mm (left and right) C. Stepped difference b from revolving frame in left-to-right direction: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Max. 5 mm D. Stepped difference a from bodywork door in left-to-right direction: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10 ± 4 mm E.
Stepped difference c from bodywork top cover in vertical direction: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Max. 5 mm PC200-6LL/PC220LL-6 30-5