6. Turn the valve 180°. Remove the bolts that hold the cover plate and gasket to the valve body. See Figure 4-471. Assembly 1. Apply Loctite to both ends of the dowel pins. Install the dowel pins in the holes marked by the arrows and in the flange for the pressure control valve. See Figure 4-474. FIGURE 4-471 4909 7. Remove the pressure control spool. See Figure 4-472. FIGURE 4-474 4912 2. Figure 4-475 shows the valve parts that will be installed into the valve body. FIGURE 4-472 4910 8. Remove the screws that hold the wire socket to the valve body. Remove the socket and harness. See Figure 4-473. FIGURE 4-475 4913 3. Insert the pressure control spool into the bore. See Figure 4-476.
FIGURE 4-473 4911 FIGURE 4-476 4914 4-110 TORQUE CONVERTER AND TRANSMISSION Mega 300-III Shop Manual