. OPERATION OPERATION CHECK OF PRIMARY CONVEYOR WARNING 3 - 59 When correcting zigzag mov ement of the primary conveyor, carry th at out 1. Foreign ma terials suc h as stones, grav el, wire chips, iron and steel bar chips, etc. are likely caught in various parts of the primary co nveyor. Check fo r them inside the conveyor, between the rollers and the belt, inside the hopper rub ber and th e belt as well as i nside the return r oller guides. If found, remove 2. Snaking of If there diagram s (a) and (b) on the right a adjustm If the s adjustin ent bolts (1 naking of t g with the ) to adjust the bel he belt cannot b adjustment bolts t .
e corrected simply by (1) at the head pulley portion, the structu re makes it also possible to adjus t the alignme nt with the carrier roller bra cket and return r oller bracket mounting b olts, so carry out adjustment with t hese bolts als 3. Check that there is no damage nor cut on the belt rubbe