. OPERATION OPERATION NOTICE for 3 seconds. dial is set to low idling position (magnetic the starting and grizzly 3 - 77 Cancelin g automatic warm-up op If it becomes necessary in an em ergency to cancel the aut omatic warm-u p operatio n or to low er the e ngine spe ed to low i dle, do as follow 1] Set the fuel contr ol dial to FULL positio n (b) and hold 2] When the fuel co (a), the engine sp PROCEDURE FOR OPERATING WORK EQUIPMENT IN COLD WEATHER NOTICE Do not c arry mperature the machine monitor to the travel mot or monitor and carryout t he warming-up operation until the e ngine co olant tem perature m onitor and hydraulic oil temperature mo .
In c old weather, always r un the engine under n o load at a mi d-range speed for at lea st 15 mi . Afte r warming up the eng ine, warm up the work equipment a s follows 1) 2) 3) Set the crusher spee d to the maximum rota tion speed an d run under no lo ad for 1 minute With the crusher run ning under no load, p ress the starting switch of the prima ry conv separator) and run th e primary conveyor (m agnetic separator) under no loa d for 1 minute With the crusher and primary conveyor (m agnetic separator) running und er no load, pr switch of the grizzly f eeder and operate th e crushe agneti feeder under no load for at least 30 minutes .
Afte r warming up the eng ine and work equipme nt, start the c rushe r operations