. OPERATION OPERATION OPERATION OF WORK EQUIPMENT WARNING PREPARATIONS FOR PRIMARY CONVEYOR When lowering the primary conveyor, use the opposite procedure from the operation to raise the primary conveyor. 1. Start the engine. 2. Set conveyor selector switch (1) on the conveyor up/down control panel to CONVEYOR (a). (Only for machines equipped with muck discharge conveyor.) 3. Press conveyor UP switch (2) and remove the conveyor from the mount hook. the up/down control switch, set the mount hook to the to match the conditions of use, then set each fixed 3 - 88 When sta rting operatio ns, set the machine on horizontal ground and carry out To preve outermos operations.
nt abnormal t lower wheel vibration during operations, check that the s (4 places) are firmly in contact with the ground. If any ab The buzz normality occ er will soun urs, press the d, and the c emergenc rusher, gr y stop izzly f magnetic separator, a nd other opt ions (muc secondar y conveyor, v ibratory sieve ) will stop. 4. positio positio (3) Fix ed position when travelin g ushing (4) Fix ed position f or normal cr (5) Fix ed position when crushin g reinfor ced concrete