Komatsu — OPERATION OF WORK EQUIPMENT

. OPERATION OPERATION 3 - 89 PREPARATIONS FOR MUCK DISCHARGE CONVEYOR (When u sed) Extend t he muck discharge conveyor (if equipped) as follows. 1. Remove travel l ock pin (1). 2. Start the engine 3. Set c onveyor s elector switch (2) on the conveyo r up/down contr ol panel to MUCK DISCHARGE CONVEYOR (b) . 4. Pres s muck discharge c onveyor DOWN switch (3) and extend the c onveyor. 5. Stop the engine 6. Remove side cover loc k bolt (4). 7. Insta ll lock bolt (5) at th e conveyor center side.