. OPERATION OPERATION OPERATING TIME UNDER NO LOAD, 30 MINUTES OR MORE or be FEEDING AMOUNT OF DEBRIS AS RAW MATERIAL Continue with the ordinary operation after the running-in, keeping the debris feeding amount less than 60% of the crusher chamber capacity. STOP OF WORKS After terminating to feed fresh debris, stop the motor, confirming that crushing work has been completed finished.
3 - 99 RUN-IN OPERATION OF JAW CRUSHER After c onfirming by ins pection t hat there is nothin g unusua l wit h the jaw crusher, carry ou t both no load operation and lo aded operation b y way of running -in in the following manner, but this should be co nducted only at the time of the i nitial NOTICE Carry o replacing parts reversin w p late. If load is in creased f ast, partia l friction caused to various inner p arts, leadi ng to their shortene d service l Check if the bearings h ave generated a bnormal heat LOADER OPERATION Start to feed fresh debr is to the jaw crush er after c onfirmin g tha t the crusher revolution sta ys steady and constant.
If the d ebris are found directly h itting the swing ja w protector, a fter starting the feeding, tr y to change the feeding mode so tha t they will not hit th e protect or. The fe eding amount at a time s hould not be up to the full c apacity, but follow the values s hown in the table below. Loade d operation (afte r no-load operatio n) Load Ratio (Charging Amount) % No. of Days 30 Two days 60 Two days 60 - (100) After the days above