. OPERATION OPERATION PILE OF MATERIAL 3 - 108 LOADING WITH MATERIAL 1. Alwa ys se t so t hat the operator o f the l oader. 2. Whe n loading wi th material, load th e machine from the si de or rear. However, when l oading with a wheel oader the lo adin g operation o nly from the rear. 3. Load the m ateria l at the position of the fixed bottom at the rear end o f the feede r (1), a nd avoid loa ding directly ont o the muck bar p ortion eeder can be Always m ainta in distance ( h) between t he top of the pile and of the conveyor to a t least 200 m m to preve nt the heigh t of the p ile of material discharged from th e conveyor from becoming h igher than the conveyor.