. MAINTENANCE SERVICE PROCEDURE 4 - 52 REPLACEMENT OF TOGGLE PLA 1. Loosen the bolts of the cru sher inspection hatc h and fi x it with a hook at th e open positio 2. Remove the dust prevent crusher. (lef 3. Wrap a nylo n sling around toggle plate (1) and sling it 4. Start the en gine. lector switch (3) to the inspection position. 5. Set mode se lector switch (3) to the i nspection positio 6. 7. Attach a war the machine Press crush ning tag to an is now worke er clearance nounce to those concerned that the d on. decrease switch (4) on the control 8. box, and mo contacts the If the tooth p engine. ve the fixed link forward until the fixed jaw plate fixed jaw plate.
lates come into contact with each other, stop the