CONFIGURATION FOR THE INSTALLATION OF THE DEMOLITION HAMMER 6.6.3.2 REMOVING THE HAMMER To remove the hammer, proceed as follows: 1 - Stop the engine and move the hydraulic controls in all directions, in order to completely release the residual pressure present in the circuits of the machine. 2 - Press the hammer control pedal to release the pressure present in the hammer delivery pipe. IMPORTANT q If the machine is equipped with backhoe servo controls, to release the residual pressure from the circuits follow the procedure indicated in the previous paragraph "6.6.3.1 INSTALLING THE HAMMER". 3 - Disconnect the hammer delivery and return pipes. Use hex wrenches: 32, 36, 38 and 41 mm.
4 - Fit the pipe sealing plugs complete with the relevant gaskets. q Make sure that the plugs are properly tightened and that there are no leakages; if the circuit is inadvertently pressurized, small leakages can be turned into thin jets that may perforate the skin or injure the eyes. q Always wear thick gloves and safety goggles to carry out this check. q To check the system for leaks, use a piece of cardboard or a wooden board. 5 - Disconnect the hammer from the mechanical constraints, as described in "3.13.4.1 CHANGING THE BACKHOE BUCKET". 6.6.4 USING THE HAMMER Consult the specific manual.
OPERATIONS WITH HAND HYDRAULIC HAMMER AND COMPACTING TOOLS q If the machine is provided with telescopic arm, this must be kept only folded. 6.6.5 MAINTENANCE The hydraulic system does not require any maintenance operation and inspection other than those prescribed for the machine. Regarding the maintenance operations required for the hammer, see the specific operation manual. 267 WARNING CAUTION