CONFIGURATION FOR THE INSTALLATION OF THE DEMOLITION HAMMER 3 - Remove the plugs of the machine pipes and of the hammer flexible pipes. Use hex wrenches: 32, 36, 38 and 41 mm. 4 - Connect the right pipe to the coupling (1) and the left pipe to the coupling (2), making sure that the sizes of the pipe fittings are as required. q When connecting the pipes, take care to prevent any impurities from getting into them. 5 - Start the machine and raise the demolition hammer positioning it vertically. 6 - Stop the machine again and lubricate the joints (see "4.5.1 LUBRICATION DIAGRAM") and the hammer (see the specific operation and maintenance manual).
7 - Before starting work, check the tightness of the circuit. q Wear thick gloves and safety goggles during this check. q To check the system for leaks, use a piece of cardboard or a wooden board. 266 TELESCOPIC ARM 1"3/16-12 ORFS 2 RWA29310 RWA29310 CAUTION STANDARD ARM 1"7/16-12 ORFS 1 RWA29280 RWA29280 WARNING STANDARD ARM 1"3/16-12 ORFS 2 RWA29300 RWA29300 TELESCOPIC ARM 1"7/16-12 ORFS 1 RWA29290 RWA29290