05220 Removal and installatisn of camshaft Preceding work: Air cleaner removed (09-400 and 09-410). Cylinder head cover removed (01-406). 63 Piston of No. 1 cylinder . . . . . . . . . . . . . . . . . . position on ignition TDC, note markings (Numbers 1 and 2). Screw plug (40) . . . . . . . . . . . . . . . . . . . . . . . . of the chain tensioner, unbolt, bolt in, 70 Nm. Warning! Screw plug is under pressure. Remove compression spring (39), replace sealing ring Oil pressure pump (68) . . . . . . . . . . . . . . . . . . . unbolt, bolt in, set to one side with lines connected (Number 4). (41)(Numbers 3 and 11). Camshaft timing gear (4) and timing chain . . . . . align.
When installing note markings. Screw (9 and 9a), 80 Nm (Numbers 5 to 8). 05 0906 - 220/l