Komatsu — WHEN REQUIRED

. MAINTENANCE MAINTENANCE PROCEDURE MAINTENANCE MAINTENANCE PROCEDURE 4 - 30 13. Drain sub-tank (4), of the sub-tank, then ad d wate r until the coolant level is between the FULL and LOW m arks. If t he s ub-tank is extremely replace it with a new part 14. Stop the engine, w ait fo r approx. 3 minutes, ad d Supercoolant up to the bottom o f the filler port, then tighten t he radiator cap (2) 15. Close engine hoo d (1).