Maintenance Schedule G420E/G424E Tier LP Engine Maintenance Schedule 35 CHECK POINT Interval Hours Daily Every 250hrs or a month Every 500 Hours or 3 months Every 1000 Hours or 6 months Every 1500 Hours or 9 months Every 2600 Hours or 15 months Every 4500 Hours or 2 years General Maintenance Section Test Fuel System for Leaks Prior to any service or maintenance activity Inspect engine for fluid leaks X Inspect all vacuum lines and fittings X Inspect electrical system- check for loose, dirty, or damaged wires and connections X Inspect all fuel fittings and hoses X Inspect Acceleration Pedal travel and operation X Engine Coolant Section Check Coolant Level X Inspect coolant hoses and fittings for leaks, cracks, swelling, or deterioration X Engine Ignition Section Inspect battery for damage and corroded cables X Inspect ignition system X Replace spark plugs X Fuel Lock-Off/Filter Section Replace LP fuel filter element X Inspect lock-off and fuel filter for leaks X Ensure lock-off stops fuel flow when engine is off X Pressure Regulator/Converter Section Test regulator pressures X Inspect pressure regulator vapor hose for deposit build-up X Inspect regulator assembly for fuel/coolant leaks X Fuel Trim Valve Section Inspect valve housing for wear, cracks or deterioration X Ensure valve seals in the closed position when the engine is off X