daewoo — Daewoo SB4136E00 Service Manual for G420E/G424E Tier LP Engine Lift Trucks

N-CA55-500TR Service AVV (Air Valve Vacuum) Testing AVV Test Hardware 1. Mixer AVV test fitting ј” NPT X ј” hose barb. 2. Union Tee ј” NPT with three ј” NPT X ј” hose barb. 3. Vacuum hose. 4. 0-20 in W.C. Magnehelic Gauge (inches of water column). AVV Test 1. Install the Union Tee fitting between the FTV and the AVV fitting. 2. Connect the vacuum hose from the Union Tee fitting to the Magnahelic gauge (Figure T1). You should now have the gauge inline between the FTV and the mixer to throttle adapter. 3. With the engine running at idle (700 RPM) the AVV should be between 5" and 10" water column.

NOTE If the measured water column is excessively high, check for a sticking or binding piston diaphragm assembly inside the mixer. (See Chapter 8 for removal, installation and disassembly of the N-CA55-500TR mixer). WARNING DO NOT spray carburetor cleaner or solvent into the mixer while installed on the engine. These chemicals may damage the oxygen sensor and cause pre-mature failure of the catalytic muffler. Gauge Fitting AVV Fitting Figure T1 G420E/G424E Tier LP Engine Test And Adjustments 81