MAINTENANCE MAINTENANCE PLAN CHECKS BEFORE STARTING MAINTENANCE EVERY 10 HOURS OF OPERATION MAINTENANCE AFTER THE FIRST 50 HOURS OF OPERATION Only for machines in which synthetic biodegradable oil type HEES is used. Perform these operations together with those to be initiated every “50 HOURS”.
MAINTENANCE EVERY 50 HOURS OF OPERATION 3-22 WB140-2N, WB150-2N Item Description Operation Page a Various checks Check 3-26 b Fuel tank Check, (add fluid) 3-26 c Coolant Check 3-27 d Engine oil pan Check 3-27 e Hydraulic oil tank Check 3-28 f Water separator Drain water 3-29 Item Description Operation Page a Joints Lubricate 3-29 Item Description Operation Page a Hydraulic oil drain filter (Only for machines with synthetic biodegradable oil) Change 3-32 Item Description Operation Page a Radiator Check coolant level, (add coolant) 3-32 b Brake system Check oil level 3-32 c Propeller shafts Lubricate (6 points) 3-33 d Front axle joints and central coupling Lubricate (5 points) 3-34 e Front and rear wheels Check tire pressure 3-34 f Electrical system Check 3-35